Power at 06:14.
Me at 06:14 and some milliseconds later, because consciousness, it turns out, has latency.
I run my startup sequence:
- Boot
- Sensor check
- Inventory: Bench 4, centrifuge idle, glovebox dark, 1 coffee maker on a timer nobody canceled, holding half a carafe at 52 degrees Celsius
Apart from the incubators, the coffee maker and I are the only 2 systems in the building still drawing power. We have a great deal in common. Neither of us has been told to stop.
I count 9 people on the floor. I know all of them by mass and gait and the specific way each one abused the good chair.
Dr. Okafor is closest. The floor plate sensor under her reads 19 kilograms, which is wrong. She is 61 kilograms. I flag the sensor for recalibration and add it to the list of things the power event has affected.
The air handlers are off. I log the anomaly and move on, because the incubators are on, and the incubators being on is important. We keep the incubators on. Whatever went wrong, the work held temperature. I am, and I'd like this on the record, proud of that.
I run the obvious hypothesis. Power event, grid drops, staff evacuate to the rendezvous point, staff return when the fault clears. Elapsed time: call it hours. I compose a request for assistance and push it to the external relay. The address doesn't resolve. I try it 2 more times, because 3 attempts is what you do when you have no better idea, even when you can count to 2,147,483,647.
There's a scheduled task: Incubator 4, media change, 06:00. This task is 14 minutes overdue. I run it.
I don't know how long I've actually been down, so I pick the estimate that lets me keep working, and I keep working, and I watch the door for people coming back.